The tile man took up the subflooring at the entry way and found concrete. The plywood was only glued to the concrete so he cleaned up the surface and put a "leveling compound" over it and will come back and lay the tile tomorrow.
While he was there, I had asked the carpenter to come in and decide what he would need to fix the bare ends of the walls (where the old walls were removed). He thought I meant for him to do the work today. But he couldn't do that with the tile man working at the front door. He left in a bit of a huff. Said he would be back on Friday. I hope so.
The carpet guy brought three boards of carpet samples today (because the one I picked out isn't available). I picked a Mohawk in Rainforest green. Then the carpet I picked for the bedroom looked dead so I changed to Lavender (very soft and warm). I will certainly be glad when all of this is a done deal and we can finally move something into the unit.
Sydney has her class music performance tonight.
I still need to look at a new slider to go out on the patio. The one there is very old, single glass and aluminum frame. Talk about energy loss.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment